Foundational
Accelerator Selection: H100 to B300 and RTX PRO 6000Three published numbers decide which accelerator suits a workload, and they are independent: memory capacity gates what fits, memory bandwidth gates decode speed, and tensor FLOPS gate prefill and training. As of September 2026 the parts NVIDIA sells for datacenters span 80 GB to 288 GB and 1.6 TB/s to 8 TB/s, and the gap between the compute number and the bandwidth number has widened every generation, which is why a part that looks four times faster on a slide is often twice as fast on a decode workload.🖧 Hardware & Cluster Build-Out
Foundational
The Bill of Materials for a Training ClusterA GPU cluster is not a pile of GPUs. A 512-GPU scalable unit built to NVIDIA's DGX SuperPOD B300 reference architecture needs 64 nodes, four separate networks, thousands of transceivers, storage that can absorb a checkpoint burst, a management plane, racks, power distribution and cooling equipment. Writing the list out in order is how a design becomes a purchase order, and the items people forget are the ones that hold up a deployment for weeks.🖧 Hardware & Cluster Build-Out
Foundational
Colocation, Power Contracts and Site SelectionFor most organizations the constraint on deploying GPUs is not the GPUs. It is finding a hall that can deliver 100 kilowatts or more per rack, reject that heat with liquid, and sign a contract for the power years before the hardware exists. Colocation contracts price reserved capacity rather than consumption, cooling capability is what eliminates most sites, and the lead time on new electrical supply is measured in years while GPUs arrive in months.🖧 Hardware & Cluster Build-Out