gang scheduling
AI infra interview questions tagged gang scheduling, across every topic.
7 questions · 3 unlocked for you
Concepts behind "gang scheduling"
The curriculum that explains the ideas these questions test.
Core
GPU Job Scheduler DesignDesign a scheduler for a shared GPU cluster is the most common design prompt in AI infrastructure interviews, because it touches everything: queues and priorities, gang placement, topology, fairness across teams, preemption and the checkpoints that make it survivable, and the failure handling that keeps a 512-GPU job alive. This page builds the design in layers, states the data model and the scheduling loop, derives the numbers (how long a job waits, how much preemption costs, how much fragmentation wastes), and lists the trade-offs the interviewer will push on.📐 AI Systems DesignSign in
Advanced
Gang Scheduling with Kueue and VolcanoA distributed training job is 64 pods that start together or not at all: if 40 are running and 24 are Pending, the 40 hold their GPUs idle at a collective barrier waiting for ranks that may never come, and two such jobs can deadlock a whole cluster. Gang scheduling makes the job the unit of admission. Kueue and Volcano add queues, quotas, priorities and preemption on top, which is what turns a pile of GPUs into a platform several teams can share without starving each other.🗂️ Scheduling & Orchestration🔒 Premium
