03Leadership bought GB300 NVL72 racks. Your datacenter is built for 15 kW cabinets. What do you tell them?▼medium★ EssentialNewMicrosoftCoreWeaveCrusoe4 repliesunlockedFour separate facility limits have to be cleared and total building capacity is not one of them. Power per rack, heat rejection, floor loading and network reach each fail independently, and each has a different remedy with a different lead time. The options that exist, priced, and the one that is usually taken.Open full answer →
24You have exactly 1 MW of facility capacity. Maximize training throughput.▼hardNewCrusoeCoreWeaveMeta4 replies◆ premiumA fixed power envelope turns hardware selection into an optimization with one objective and several overheads competing for the same watts. Where the 1 MW actually goes, why the answer is not simply the most efficient GPU, and the two overheads that can be cut to buy more compute.Open full answer →